Recent news:

Another two ski jumps closed: is this the end of ski jumping in Harrachov?

FIS Congress 2018: New future perspectives for Nordic Skiing

Planica 7 – More than just a final

The 38th Forum Nordicum in Klingenthal (Deutschland) - What is important for the Olympic winter?

New summer jumping hills in Ironwood and Red Wing to be constructed by 2019

more



Latest updates:

2018-06-17

CZE-TJablunkov

POL-KChochołów

POL-KZakopane

CZE-LHarrachov   NEW!

CZE-LHarrachov

NOR-04Trysil

POL-DJelenia Góra

POL-KJordanów

SVKBanská Bystrica

POL-KNowy Sącz

POL-DMiędzygórze

POL-KLimanowa

POL-KLimanowa

2018-06-14

SVKTatranská Polianka

POL-KSzczawnica

more




Advertisement:





Partner:


Peter Riedel Sports Technology


SkokiPolska.pl


Skispringen-Community Forum

SPANavacerrada

Data | History | Contact | Map | Comments

.

Trampolín de Saltos Luis Arias:

K-Point: 30 m
Year of construction: 1954
Further jumps: no
Status: destroyed
Plastic matting: no
Ski club: CA Español

to top

History:

In 1954 in the skiing resort Navacerrada near Madrid a small ski jumping hill was constructed. After the end of ski jumping activities the slope was used as a halfpipe for some time, but today there is only the beginners slope beside it.

to top

Contact:

to top

Map:

Advertisement:


to top

Comments:

Post comment:

Token:
Name:
Email:
Title:
Post:
bold | italics | underline | link
1)   Pablo   wrote on 2018-03-13 at 11:51:

the ski jumping hill was located here 40.789732, -4.008669

to top



Social Bookmarks

Copyright © Ski Jumping Hill Archive 2002-2018
www.skijumpinghills.com